*All prices include VAT, shipping costs will be charged separately.
Approx. in stock from 13.06.2025
- Type: Pocket Knife
- Engraving: Yes
- Brand: Magnum
- Overall Length: 18,40 cm
- Blade Length: 8,00 cm
- Blade Thickness: 2,70 mm
- Weight: 78,00 g
- Blade Material: 440B
- Handle Material: G10
- Opener: Nail Nick
- Opening: Manual
- Lock Type: Slipjoint
- Made in: Asia
- Item Number: 01SC080
Warning and safety information:
Cut injuries: The most common danger when using knives is the risk of cuts. Sharp blades can quickly penetrate skin and tissue.
Slipping of the knife: Improper or excessive pressure can cause the knife to slip, resulting in uncontrolled movements that can cause injuries.
Injuries due to falls: Knives should never be left unsecured or near table edges to prevent them from falling and injuring someone.
Blunt knives: Blunt knives pose a greater risk of injury as they require more force and can slip more easily. Knives should therefore be properly sharpened regularly.
Improper use: Using a knife for tasks for which it is not intended (e.g. as a lever tool) can not only damage the blade, but also lead to accidents.

In stock
- Pocket Knife
- VG-10
- Micarta
- Kansei Matsuno
- Linerlock
- Thumb Stud

In stock
- Pocket Knife
- Damascus
- Ebony
- Slipjoint
- Nail Nick

In stock
- Pocket Knife
- D2
- G10
- Stan Moizis
- Slipjoint
- No

In stock
- Pocket Knife
- 440C
- Stainless Steel
- Slipjoint
- Flipper

In stock
- Pocket Knife
- 8Cr13MoV
- Micarta
- Linerlock
- Thumb Hole

In stock
- Pocket Knife
- Damascus
- Ebony
- Slipjoint
- Nail Nick

Approx. in stock from 29.04.2025
- Pocket Knife
- 440A
- Rosewood
- Push Button
- Push Button

Approx. in stock from 04.04.2025
- Pocket Knife
- 440A
- Rosewood
- Backlock
- Nail Nick

No longer available
- Pocket Knife
- 12C27
- G10, Carbon Fibre
- Slipjoint
- Nail Nick

Approx. in stock from 21.04.2025
- Pocket Knife
- 440A
- Pakka Wood
- Backlock
- Nail Nick

No longer available
- Pocket Knife
- 440A
- Micarta
- Slipjoint
- Nail Nick

In stock
- Pocket Knife
- VG-10
- G10
- Raphael Durand
- Slipjoint
- No

2 weeks approx. from order
- Pocket Knife
- 14C28N
- G10, Stainless Steel
- Linerlock
- Nail Nick
Magnum
Magnum offers a wide range of knives from all categories, from traditional pocket knives to hunting knives and modern tactical knives. The attractive Boker brand is known for its unbeatable price-performance ratio. However, it is not only the price-sensitive knife enthusiast who is fascinated by the wide range of handle materials and practical blade steels. The concept takes place in Solingen, design, construction and finishing in Asia.
Manufacturer information: |
Magnum offers a wide range of knives from all categories, from traditional pocket knives to hunting knives and modern tactical knives. The attractive Boker brand is known for its unbeatable... more
