🚚 Schneller Gratisversand ab 49€: vor 11.00 Uhr bestellt, am selben Tag verschickt!

🤝 Neu: Apple Pay & Google Pay jetzt über „Novalnet-Payments“ im Checkout verfügbar.

🔪 Kostenloser Nachschärfservice auf alle Messer der Marken Böker Germany, Böker USA und Böker Argentina!

Magnum  |  SKU: 01SC080

Long Lead EDC

Sale price €26,95 Regular price €35,95
Tax included plus shipping


  • Klingenlänge cm: 8
  • Gewicht g: 78
  • Griffmaterial: G10
  • Klingenstahl: 440B
  • WaffG-Einstufung: Legal Carry
  • Gefertigt in: Asia

Spezifikationen

  • Artikeltyp: Pocket Knives
  • Öffnung: Manual
  • Öffnungshilfe: Nail Nick
  • Klingenfarbe: Uncoated
  • Klingenstärke mm: 2,7
  • Gesamtlänge cm: 18,4
  • Farbe: Black
  • Marke: Magnum
  • Lasergravur: No
  • Verschluss: Slipjoint

Warnhinweise und Sicherheitsinformationen:

Warning and safety information: Cut injuries: The most common danger when using knives is the risk of cuts. Sharp blades can quickly penetrate skin and tissue. Slipping of the knife: Improper or excessive pressure can cause the knife to slip, resulting in uncontrolled movements that can cause injuries. Injuries due to falls: Knives should never be left unsecured or near table edges to prevent them from falling and injuring someone. Blunt knives: Blunt knives pose a greater risk of injury as they require more force and can slip more easily. Knives should therefore be properly sharpened regularly. Improper use: Using a knife for tasks for which it is not intended, such as as a lever tool, can not only damage the blade, but also lead to accidents.

GPRS

Herstellerinformationen:
Heinr. Böker Baumwerk GmbH
Schützenstr. 30, 42659 Solingen, Germany
Web: www.boker.de
E-Mail: info@boker.de
Telefon: +49 212 40120

Description

The Magnum Long Lead EDC is a classic gentleman's and gourmet pocket knife for everyday use. Its simple, slightly curved design is instantly appealing. The no-frills design also corresponds to its technical construction as a slip-joint knife, which has proven itself a million times over thanks to its ease of use and fewer components. The satin-finished blade made of 440B stainless steel is flat-ground, is opened by nail nick and does not lock. The lightly contoured handle scales made of textured G10 fit comfortably in the hand. With clip (tip-down/r).