{"product_id":"long-lead-edc-01sc080","title":"Long Lead EDC","description":"The Magnum Long Lead EDC is a classic gentleman's and gourmet pocket knife for everyday use. Its simple, slightly curved design is instantly appealing. The no-frills design also corresponds to its technical construction as a slip-joint knife, which has proven itself a million times over thanks to its ease of use and fewer components. The satin-finished blade made of 440B stainless steel is flat-ground, is opened by nail nick and does not lock. The lightly contoured handle scales made of textured G10 fit comfortably in the hand. With clip (tip-down\/r).","brand":"Magnum","offers":[{"title":"Default Title","offer_id":47355457470626,"sku":"01SC080","price":26.95,"currency_code":"EUR","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0641\/7498\/1282\/files\/01sc080.jpg?v=1782046009","url":"https:\/\/boker.de\/en\/products\/long-lead-edc-01sc080","provider":"Böker Solingen","version":"1.0","type":"link"}